OVERVIEW

Herron Coorey were engaged to extend Newstead Brewing Co’s external facilities.

HOW WE HELPED

The works included an additional four fermenting tanks with associated gantries and roof structure as well as minor demolition works internally to accommodate for another fermenting tank to be installed. 

The project works included the saw cutting of existing slabs, installation of screw piles, formwork and subsequent pouring of new concrete slabs, installation of fermenting tanks and extension of roof structure to cover these tanks followed by gantry walkway around the entire structure.

Herron Coorey worked with Fairweather Architecture and structural engineer BE Collective to deliver this project to our client.

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

— John Smith, Company A

Herron Coorey Pty Ltd. ACN 103 432 695 ABN 87 103 432 695 QBCC Lic. No. 1021625