OVERVIEW

Herron Coorey tendered and were successful in being chosen to carry out works to Allnex’s facility in Wacol.

HOW WE HELPED

The project works included construction of three first flush in ground retention tanks enclosed by fencing and gates with concrete vehicle ramps providing loading zone access to their warehouse to assist with distribution and delivery services.

Further works included the relocation of fire mains to accommodate for the retention tanks with  stone pitched outlets, grassed swale with concrete invert and concrete pathways around the area of works.

The project was completed on programme in 9 weeks in 2018 with a total project cost of $600k

 

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

— John Smith, Company A

Herron Coorey Pty Ltd. ACN 103 432 695 ABN 87 103 432 695 QBCC Lic. No. 1021625
Copyright 2023 Herron Coorey. All rights reserved. Privacy Policy. Terms & Conditions.